Skip to main content

Fixed-scope software projects, no change-order surprises

Fixed-price projects often end in change-order invoices. We lock the scope in writing, run 2-8 week sprints with AI coding agents doing the volume, and a senior engineer reviews every change.

2-8 Weeks
Fixed scope, written down
Up to 10x
Shipped, reviewed work per engineer
Deployed
Through CI, not handed over in a zip

Small scope. Real production code.

A short project is not a shortcut. Every deliverable is tested, reviewed by a senior engineer and deployed through CI.

Prototype first

If the idea is unproven, a short agentic prototype tests it before the build is committed.

Focused sprints

2-4 week sprints with one goal each. Agents implement; a senior engineer reviews and merges.

Shipped through CI

Automated CI/CD pipelines take each reviewed change to production.

Agentic AI Tools

Claude Code, OpenAI Codex and MCP, for up to 10x shipped, reviewed work per engineer.

How a fixed-scope project runs

Scope is written down before sprint one. Changes go through change control that shows timeline and cost impact before you approve.

1

Lock scope, prototype if needed

We write the scope and acceptance criteria. If the idea is unproven, an agentic prototype tests it first in 1-2 weeks.

2

Build in focused sprints

2-4 week sprints. AI coding agents implement and test; a senior engineer reviews every change before it merges.

3

Deploy through CI

Automated CI/CD pipelines ship each reviewed increment, so you see working software, not status reports.

4

Close out or extend

We finish against the written acceptance criteria, then hand over or plan the next phase. Your call.

Typical timeline

2-8 weeks, by sprint

1
Week 1-2
Scope and prototype
2
Week 3-4
Build sprints
3
Week 5-6
Deploy through CI
4
Week 7-8
Iterate and hand over
Done means deployed
Against written acceptance criteria

When fixed scope beats time and materials

Fixed scope buys cost certainty when you know what you need. When requirements keep moving, a dedicated team fits better.

Cost certainty

One agreed scope, one agreed price, delivered in 2-8 weeks.

Shipped, not handed over

Automated CI/CD deploys each increment after senior review.

Up to 10x velocity

Measured as shipped, reviewed work per engineer. AI coding agents do the implementation volume.

Senior-reviewed

A senior engineer reviews every agent change before it merges.

Focused sprints

2-4 week sprints, each with a single goal and a demo at the end.

Change control in writing

Scope changes show their timeline and cost impact before you approve them.

Projects that fit 2-8 weeks

Well-defined work with a clear finish line.

Startups & MVPs

A defined feature set for an early-stage product, built to production standard.

A single feature

One feature or enhancement, specified up front and shipped to production.

Proof of concept

Prove a technical approach works before you commit a team to it.

Fixes and upgrades

A defined backlog of bugs or upgrades, cleared by agents under senior review.

Integrations

Third-party services and APIs connected, tested and monitored.

Prototypes and MVP slices

Tightly scoped prototypes and MVP slices for new ideas.

What fixed scope covers, and what it does not

The boundaries are written down before the first sprint, so nobody discovers them on the invoice.

DimensionIncluded in the fixed priceOutside it (handled by change control)
DeliverablesThe features, integrations or fixes listed in the scope documentNew features or integrations added after sign-off
AcceptanceAcceptance criteria agreed up front, tested before handoverCriteria that change once the build has started
QualityTests, CI and senior review on every changeHardening of systems outside the scope (for example a legacy service it calls)
EnvironmentsDeployment to the environments named in the scopeNew environments, regions or hosting moves
HandoverCode in your repo, documentation and a knowledge-transfer sessionOngoing support or a retained team, which is a separate engagement
ChangesSmall clarifications that do not move the timelineAnything else: you see the time and cost impact and approve it first

Work that keeps moving fits better with a dedicated team.

Fixed-scope projects: the questions buyers ask

Fixed price vs time and materials, how scope is locked, and what happens after

Choose fixed scope when you can describe the deliverable and its acceptance criteria up front: you get cost certainty. Choose time and materials or a dedicated team when requirements will keep moving. Forcing a moving target into a fixed price is how change-order invoices start.

Feature builds, integrations, proofs of concept, prototypes, bug-fix backlogs and upgrades: anything with a clear definition of done. If the work has no finish line, a dedicated team is the better fit.

Before the first sprint we write down the deliverables and acceptance criteria and agree them with you. Any change goes through change control that shows the timeline and cost impact before you approve it.

Both, with clear roles. AI coding agents (Claude Code, OpenAI Codex, MCP servers) write implementation and tests. A senior engineer owns the architecture, reviews every agent change and merges it through CI. Up to 10x means shipped, reviewed work per engineer, not a promise about calendar time.

You get the code in your repo, documentation and a knowledge-transfer session. From there you can run it yourself, start another fixed-scope project or move to a longer-term team.

Yes. We can deliver a fixed-scope piece alongside your team, in your repo and your workflow, with the same senior review gate on every change.

Our Partners and Clients

From Acceltree's $60M+ exit to enterprise cloud, mobile, and agentic product builds

AccelTree Logo
Avertra Logo
Artesian Logo
Design Tech Logo
Energy Logic Logo
Local Governance Logo
Visionaire Logo
Vita Life Clinic Logo
Team Global Logo

Scope it. Price it. Ship it.

Join 200+ companies that build with iWork. Start with a free audit and find out whether your project fits a fixed scope.

Before you go: the free guide

The Ultimate Guide to Agentic Product Development, as an instant PDF download.

No spam. See our Privacy Policy.